![]() ![]() For all\ other locations, use screened acceptable material from onsite excavations, unless otherwise indicated. Backfill for excavations within the City of Middletown road rights of way shall be granular fill meeting the requirements of CT DOT Form 817, Section M.02.01, paragraphs 1 and 2, Grading A. JC0003: One foot above top of pipe to finished grade or to pavement subbase: Use\ screened acceptable material from onsite excavations, unless otherwise indicated. For all other locations, use screened acceptable material from onsite excavations, unless otherwise indicated. 1kFavs - Use the code for 10,000 Cash AISettings - Use the code for 5,000 Cash Sorry - Use the code for 1,000 Cash If one of these codes doesn't work, let us know about it in the. Backfill for excavations within the City of Middletown road rights of way shall be granular\ fill meeting the requirements of CT DOT Form 817, Section M.02.01, paragraphs 1 and 2, Grading A. ![]() ![]() ºËâU8Ou>¶QW >/C/Contents(JC0003: One foot above top of pipe to finished grade or to pavement subbase: Use screened acceptable material from onsite excavations, unless otherwise indicated. JC0003: Temporary surfacing shall be placed over trenches in hard surfaced streets and roads, and other areas where directed and shall be of bituminous concrete base course as specified herein before, laid in two one course s, 2 inches thick as indicated on drawing C-505A. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |